r5.jpgThis is a Milwaukee bathroom TAG recently completed.  Our challenge with this job was to customize this second floor bath for the homeowner who has some physical limitations and needed supports in the bathroom, including handrails and a bench seat for showering, as well as an overall remodel including extensive tile work.  For this bathroom, we stayed within the original layout of the room, as we did not move any plumbing fixtures to new locations.

 This homeowner was so pleased with the outcome of the bathroom that TAG was asked back to complete work elsewhere in the home, including a new kitchen ceiling and reinforcing a stair railing for safety reasons.

r1.jpg   r3.jpg   r4.jpg  r51.jpg   r6.jpg

Waukesha Addition

garibaldi-addition10.jpg

A one room addition was completed recently by TAG Improvements in Waukesha.  We replaced a 3 seasons room with a permanent addition, re-roofing the entire home, replacing a bow window in front of the home and residing the front of the house with cedar.  All new windows and doors are Pella products-Designer Series with in window blinds.  The flooring used was character grade hickory, and finished in a natural stain. 

garibaldi-addition1.jpg garibaldi-addition2.jpg garibaldi-addition4.jpg garibaldi-addition3.jpg garibaldi-addition5.jpg garibaldi-addition7.jpg  garibaldi-addition9.jpg garibaldi-addition8.jpg  garibaldi-addition6.jpg

Concrete Work

concrete-002.jpgThese are photos of some of the concrete work we have done in the past.  TAG has done driveways, patios, and walkways in concrete, using stamped and colored concrete techniques depending on the job.  Concrete is a solid and durable material that can be used for many different situations.  Your imagination is the limit!

concrete-001.jpg  concrete-3.jpg  concrete-004.jpg  concrete-006.jpg  concrete-007.jpg

Wauwatosa Bathroom

gbath1.jpgThis is a bathroom completed in Wauwatosa.  It was a complete gut and remodel down to the 2×4’s, as the bathroom was original from the 1960’s with minor water damage. TAG followed the original layout of the room.  The toilet needed to be moved a few inches to accomodate the larger whirlpool tub.  The products that were used included a tile floor and surround, a Kohler whirlpool tub and fixtures, a maple vanity with a solid surface quartz Zodiaq countertop.

gbath2.jpg   gbath3.jpg gbath4.jpg  gbath5.jpg   gbath6.jpg